| Construction Plans |
| Location |
| Breaking ground |
| Foundation |
| Walls |
| Roof |
| Almost complete |
Gjithe te mirat
"All the best"
MI
| Emiland (in the black shirt and khakis) sitting with the construction workers at the distillery |
| Looking at the roof from the inside of the building |
| Emiland looking inside the equipment |
| Part of the distillery equipment- where the condesation takes place |
| Brian sitting outside looking at one of the almost complete walls |
| The distillery just before the roof was completed |
| Roof is complete and now just a little more paint and outdoor finishes |
| The steamer |
| Two distillery units |