| The gravel will be used to level the ground before pouring concrete. |
| The road that runs from the main highway to the back of the property. Again, this will be paved in the future. |
The distillery construction is following the timeline quite well. Assuming it does not rain too much in the short term, the building should be completed as scheduled.
Gjithe te mirat
"All the best"
MI
No comments:
Post a Comment